Solutions From Concept To Completion
betsafe sports|Most Popular_Solutions
Site Solutions From Concept To Completion
betsafe sports|Most
Solutions Where Land Meets Water
betsafe casino review|Most
Solutions From Procurement To Completion
betsafe review|Most Popular_+
Structural + Mechanical Specialists
betsafe sports|Most Popular_Al
Consultation, Design + Inspection
betsafe casino online|Welcome
Soil + Foundation
betsafe casino online|Welcome
Investigation + Litigation Support
betsafe review|Most Popular_of
Arts + Entertainment
Live Performances
Museums + Art Displays
Pop-Ups
Signage
Studios + Sound Stages
TV + Film Production
Theaters
Theme Parks + Playplaces
betsafe casino
Education
Colleges + Universities
Private + Specialty Schools
Public K-12
betsafe casino
Energy
Solar Energy
Transmission Infrastructure
Wind Energy
Oil + Gas
betsafe casino
Government
Municipal
State
Federal
betsafe casino
Healthcare
Senior Care
Hospitals
Outpatient Facilities
betsafe casino
Industrial
Heavy Industrial
Warehouse + Distribution Centers
Industrial Ports + Terminals
betsafe casino
Ports + Coastal
Berths, Piers + Wharves
Bulkheads
Esplanades
Ferry Landings, Ship Terminals
betsafe review Floating Structures
Ports + Terminals
Marinas + Breakwaters
Transfer Stations
betsafe casino
Public Infrastructure
Bikeways + Trails
Garage + Parking Facilities
Park + Recreational Spaces
Streetscapes
Utility Infrastructure
Water + Wastewater
betsafe casino
Real Estate Development
Commercial
Community Facilities
Mixed-Use
Multifamily Residential
betsafe casino
Transportation
Airports
Bridges
Ports + Terminals
Rail Transportation
Roads + Highways
Ropeway + Linear Infrastructure
betsafe casino
Floating Harbor Wetland
Multimodal Processing Plant
416 + 420 Kent Dynamic Highrise
Wittpenn Bridge
Tiffany Crane
LaGuardia Airport Terminal B
NYC Ferry
Orlando Airport LED Displays
A leading full-service engineering firm renowned for our trusted, high quality, and innovative approach to solving complex challenges.

betsafe review

Part of the National Aquarium in Baltimore’s Master Plan is to transform the canal between Piers 3 and 4, in Baltimore’s Inner Harbor, into a 10,500 square foot floating wetland habitat. McLaren Engineering Group worked to transform their vision into a reality by engineering a floating shoreline ecosystem that attracts native species while improving water quality, and providing visitors a unique perspective of the salt marsh habitat and the critical role it plays in the health of the Chesapeake Bay’s ecosystem.

To test the stability and resiliency of a large-scale project, McLaren’s betsafe casino review|Most engineered a 15-foot by 20-foot award-winning small-scale prototype that is currently exceeding expectations in the Aquarium’s waterfront campus in Baltimore’s Inner Harbor.

betsafe review

betsafe casino bonus|Free was developed using a variable buoyancy – zoned ballast system.

Drawing of the National Aquarium Floating Wetland Protype

Floating Wetlands Mimic Chesapeake Bay Tidal Marshes

The full scale of the floating wetlands includes a shallow channel through the center, which mimics natural tidal marshes throughout the Chesapeake Bay area.

This final model contains a new flotation system featuring scaled down wetlands to 8-foot by 12-foot platforms that connect through pinned connections.

Project Milestones

Our team, working alongside architecture firm Ayers Saint Gross, aims to complete this brand-new, immersive, educational National Aquarium experience in 2024.

Official Opening
Tidal Marsh Plantings
Installation
PET (Polyethylene Terephthalate) Installed
Getting ready for plantings
Construction Started